Location
Westminster
Zone 1, Victoria
Type
Refurbishment and extension
Delivered
113 student beds and 45 room aparthotel
Status
Operational
Student accommodation
Environmental Strategy
Solar
We incorporate solar panels wherever possible to self-sustain electrical demand.
SuDS
We use sustainable urban drainage systems to minimise rainwater run off rates and mitigate flood risk.
Green Rroof
We utilise green roofs to boost biodiversity, contribute to carbon capture and reduce rain water run off-rates whilst increasing rain water storage.
Circular Economy
We focus on refurbishing buildings and re-using materials across our sites to minimise waste and embodied carbon.
Smart Controls
We incorporate the latest technology to allow occupiers to have smart control over their energy use, minimising consumption.
Efficient Fabric
Working within the historic constraints of buildings, we utilise highly efficient fabric and fittings.
Heritage Context
High - Setting of Conservation Area and Listed Buildings
8 min
walk to Houses of Parliament
5 min
walk to Tate Britain
8 min
walk to St James Park tube station
Existing retail shopping centre with significant placemaking and development potential
Kindly share your contact information and a member of our team will be in touch.